Single-Axis Tracker Retrofit

Single-Axis Tracker Retrofit in Ibri, delivered by one accountable GLOBAL team. 8 MW AC · Retrofit.

Key facts

Client
Commercial & institutional client
Location
Ibri, Ad Dhahirah
Capacity
8 MW AC
Scope
Retrofit
Status
Completed

01 — Overview

Single-Axis Tracker Retrofit: one accountable team from planning to handover.

Single-Axis Tracker Retrofit is part of GLOBAL's renewable energy portfolio in the Sultanate of Oman. The work in Ibri is delivered with engineering, procurement, construction and handover managed by a single GLOBAL team.

Full project details, drawings and client references are available on request. Figures and dates shown here are illustrative placeholders pending confirmation by GCMS.

03 — Scope of work

Delivered by one accountable team

Planning, execution and handover under one QHSE system.

  1. 01

    Engineering & design

    PV layout, electrical design, grid-connection studies and detailed construction drawings.

  2. 02

    Procurement & logistics

    Modules, inverters and mounting structures sourced, inspected and delivered to site.

  3. 03

    Construction & installation

    Civil, mechanical and DC/AC electrical works, SCADA and monitoring installation.

  4. 04

    Testing & commissioning

    Grid-code compliance testing, energisation, handover and operator training.

04 — Project timeline

From award to commissioning

Indicative programme — dates to be confirmed.

  1. Step 01

    Award

    Contract awarded and mobilisation agreed for Single-Axis Tracker Retrofit.

    CompletedQ1 2025

  2. Step 02

    Engineering & Procurement

    Detailed design, method statements and long-lead procurement.

    CompletedQ2 2025

  3. Step 03

    Construction

    Execution on site under GLOBAL's QHSE management system.

    CompletedQ3 2025 – Q1 2026

  4. Step 04

    Commissioning

    Testing, handover and training for the client's operations team.

    CompletedQ2 2026

05 — Key figures

The project at a glance

Illustrative figures, to be confirmed by GCMS.

  • 25yr

    Design life of the installation

    Illustrative

  • 98%

    Target plant availability

    Indicative

  • 12mo

    Planned delivery programme

    Indicative

  • 0LTI

    Target lost-time injuries

    Our zero-harm goal

Start a project

When Quality Matters, We Deliver.

Talk to our Muscat team about engineering, building and operating your next power, water or solar asset.

Newsletter

Stay informed with GLOBAL

Project news, awards and insights from GCMS — straight to your inbox.