
Sur Coastal Solar Farm
Sur, Ash Sharqiyah South
12 MW AC · EPC
Al Safa Solar Plant in Ad Dhahirah, delivered by one accountable GLOBAL team. 20 MW AC · EPC.
Key facts
01 — Overview
Al Safa Solar Plant is part of GLOBAL's renewable energy portfolio in the Sultanate of Oman. The work in Ad Dhahirah is delivered with engineering, procurement, construction and handover managed by a single GLOBAL team.
Full project details, drawings and client references are available on request. Figures and dates shown here are illustrative placeholders pending confirmation by GCMS.
02 — Gallery

On site — Ad Dhahirah



On site — Ad Dhahirah


03 — Scope of work
Planning, execution and handover under one QHSE system.
01
PV layout, electrical design, grid-connection studies and detailed construction drawings.
02
Modules, inverters and mounting structures sourced, inspected and delivered to site.
03
Civil, mechanical and DC/AC electrical works, SCADA and monitoring installation.
04
Grid-code compliance testing, energisation, handover and operator training.
04 — Project timeline
Indicative programme — dates to be confirmed.
Step 01
Contract awarded and mobilisation agreed for Al Safa Solar Plant.
CompletedQ1 2026
Step 02
Detailed design, method statements and long-lead procurement.
NextQ2 2026
Step 03
Execution on site under GLOBAL's QHSE management system.
PlannedQ3 2026 – Q1 2027
Step 04
Testing, handover and training for the client's operations team.
PlannedQ2 2027
05 — Key figures
Illustrative figures, to be confirmed by GCMS.
25yr
Design life of the installation
Illustrative
98%
Target plant availability
Indicative
12mo
Planned delivery programme
Indicative
0LTI
Target lost-time injuries
Our zero-harm goal
Start a project
Talk to our Muscat team about engineering, building and operating your next power, water or solar asset.
Newsletter
Project news, awards and insights from GCMS — straight to your inbox.