Al Safa Solar Plant
Ad Dhahirah, Oman
20 MW AC · EPC

Nizwa Rooftop Solar Programme in Nizwa, delivered by one accountable GLOBAL team. 4.2 MW DC · Rooftop PV.
Key facts
01 — Overview
Nizwa Rooftop Solar Programme is part of GLOBAL's renewable energy portfolio in the Sultanate of Oman. The work in Nizwa is delivered with engineering, procurement, construction and handover managed by a single GLOBAL team.
Full project details, drawings and client references are available on request. Figures and dates shown here are illustrative placeholders pending confirmation by GCMS.
02 — Gallery
On site — Nizwa


On site — Nizwa


03 — Scope of work
Planning, execution and handover under one QHSE system.
01
PV layout, electrical design, grid-connection studies and detailed construction drawings.
02
Modules, inverters and mounting structures sourced, inspected and delivered to site.
03
Civil, mechanical and DC/AC electrical works, SCADA and monitoring installation.
04
Grid-code compliance testing, energisation, handover and operator training.
04 — Project timeline
Indicative programme — dates to be confirmed.
Step 01
Contract awarded and mobilisation agreed for Nizwa Rooftop Solar Programme.
CompletedQ1 2025
Step 02
Detailed design, method statements and long-lead procurement.
CompletedQ2 2025
Step 03
Execution on site under GLOBAL's QHSE management system.
CompletedQ3 2025 – Q1 2026
Step 04
Testing, handover and training for the client's operations team.
CompletedQ2 2026
05 — Key figures
Illustrative figures, to be confirmed by GCMS.
25yr
Design life of the installation
Illustrative
98%
Target plant availability
Indicative
12mo
Planned delivery programme
Indicative
0LTI
Target lost-time injuries
Our zero-harm goal
Start a project
Talk to our Muscat team about engineering, building and operating your next power, water or solar asset.
Newsletter
Project news, awards and insights from GCMS — straight to your inbox.