University of Buraimi Solar PV — Phase 2

Doubling the university's on-campus solar capacity from 1.5 MW to 3 MW, delivered by one accountable EPC team.

Key facts

Client
University of Buraimi
Location
Al Buraimi, Oman
Capacity
1.5 MW (Phase 2) → 3 MW total
Scope
Engineering, Procurement & Construction (EPC)
Status
Awarded

01 — Overview

Phase 2 doubles the university's solar capacity, from 1.5 MW to 3 MW.

GCMS has been awarded Phase 2 of the University of Buraimi solar PV plant, extending the installation delivered under Phase 1 and doubling total capacity to 3 MW. The scope is delivered on an EPC basis, with engineering, procurement, construction and commissioning managed by one accountable GCMS team.

The expanded plant supplies clean, on-campus power to the university, reduces reliance on grid electricity and shows what utility-grade renewable energy delivery looks like in the Sultanate.

03 — Scope of work

Turnkey delivery, from design to handover

One accountable team across the full EPC lifecycle.

  1. 01

    Engineering & design

    PV layout, electrical design, grid-connection studies and detailed construction drawings.

  2. 02

    Procurement & logistics

    Modules, inverters and mounting structures sourced, inspected and delivered to site.

  3. 03

    Construction & installation

    Civil, mechanical and DC/AC electrical works, SCADA and monitoring installation.

  4. 04

    Testing & commissioning

    Grid-code compliance testing, energisation, handover and operator training.

04 — Project timeline

From award to commissioning

Indicative programme — dates to be confirmed.

  1. Step 01

    Award

    Contract awarded for Phase 2 of the university solar PV plant.

    CompletedQ3 2026

  2. Step 02

    Engineering & Procurement

    Detailed design, equipment selection and long-lead procurement.

    NextQ4 2026 – Q1 2027

  3. Step 03

    Construction

    Civil, structural and electrical installation of the 1.5 MW extension.

    PlannedQ1 – Q3 2027

  4. Step 04

    Commissioning

    Testing, grid synchronisation, handover and operator training.

    PlannedQ4 2027

05 — Key figures

The project at a glance

Illustrative figures, to be confirmed by GCMS.

  • 3MW

    Total capacity on completion

    Phase 1 + Phase 2

  • +1.5MW

    Added capacity in Phase 2

    Doubles installed capacity

  • 2,300

    Tonnes of CO₂ avoided per year (est.)

    Illustrative estimate

  • 12mo

    Planned delivery programme

    Indicative

Start a project

When Quality Matters, We Deliver.

Talk to our Muscat team about engineering, building and operating your next power, water or solar asset.

Newsletter

Stay informed with GLOBAL

Project news, awards and insights from GCMS — straight to your inbox.