Skip to content
GLOBAL — home

Gas Turbine Power Station — O&M

Gas Turbine Power Station — O&M in Sohar, delivered by one accountable GLOBAL team. 2 × 125 MW · O&M.

Key facts

Client
Power generation client
Location
Sohar, Al Batinah North
Capacity
2 × 125 MW
Scope
O&M
Status
In delivery

01 — Overview

Gas Turbine Power Station — O&M: one accountable team from planning to handover.

Gas Turbine Power Station — O&M is part of GLOBAL's power generation portfolio in the Sultanate of Oman. The work in Sohar is delivered with engineering, procurement, construction and handover managed by a single GLOBAL team.

Full project details, drawings and client references are available on request. Figures and dates shown here are illustrative placeholders pending confirmation by GCMS.

03 — Scope of work

Delivered by one accountable team

Planning, execution and handover under one QHSE system.

  1. 01

    Assessment & planning

    Condition surveys, outage planning and method statements agreed with the plant owner.

  2. 02

    Parts & materials

    Long-lead spares and consumables sourced, inspected and staged ahead of the outage window.

  3. 03

    Execution on site

    Mechanical, electrical and instrumentation work delivered under permit-to-work control.

  4. 04

    Testing & return to service

    Functional tests, performance checks and a documented handover back to operations.

04 — Project timeline

From award to commissioning

Indicative programme — dates to be confirmed.

  1. Step 01

    Award

    Contract awarded and mobilisation agreed for Gas Turbine Power Station — O&M.

    CompletedQ1 2026

  2. Step 02

    Engineering & Procurement

    Detailed design, method statements and long-lead procurement.

    NextQ2 2026

  3. Step 03

    Construction

    Execution on site under GLOBAL's QHSE management system.

    PlannedQ3 2026 – Q1 2027

  4. Step 04

    Commissioning

    Testing, handover and training for the client's operations team.

    PlannedQ2 2027

05 — Key figures

The project at a glance

Illustrative figures, to be confirmed by GCMS.

  • 24/7

    Operations and maintenance cover

    Continuous coverage

  • 99%

    Target plant availability

    Indicative

  • 8wk

    Typical planned outage window

    Indicative

  • 0LTI

    Target lost-time injuries

    Our zero-harm goal

Start a project

When Quality Matters, We Deliver.

Talk to our Muscat team about engineering, building and operating your next power, water or solar asset.

Newsletter

Stay informed with GLOBAL

Project news, awards and insights from GCMS — straight to your inbox.