Storage Tank Farm Foundations

Storage Tank Farm Foundations in Duqm, delivered by one accountable GLOBAL team. 6 tanks · Civil & structural.

Key facts

Client
Industrial developer
Location
Duqm, Al Wusta
Size
6 tanks
Scope
Civil & structural
Status
Completed

01 — Overview

Storage Tank Farm Foundations: one accountable team from planning to handover.

Storage Tank Farm Foundations is part of GLOBAL's infrastructure & epc portfolio in the Sultanate of Oman. The work in Duqm is delivered with engineering, procurement, construction and handover managed by a single GLOBAL team.

Full project details, drawings and client references are available on request. Figures and dates shown here are illustrative placeholders pending confirmation by GCMS.

03 — Scope of work

Delivered by one accountable team

Planning, execution and handover under one QHSE system.

  1. 01

    Survey & design

    Topographic survey, geotechnical review and construction-ready civil and structural design.

  2. 02

    Materials & plant

    Aggregates, steel and equipment procured locally wherever possible and scheduled to the programme.

  3. 03

    Civil & site works

    Earthworks, foundations, drainage and utilities built to inspection and test plans.

  4. 04

    Inspection & handover

    As-built records, quality close-out and a clean handover to the client's operations team.

04 — Project timeline

From award to commissioning

Indicative programme — dates to be confirmed.

  1. Step 01

    Award

    Contract awarded and mobilisation agreed for Storage Tank Farm Foundations.

    CompletedQ1 2024

  2. Step 02

    Engineering & Procurement

    Detailed design, method statements and long-lead procurement.

    CompletedQ2 2024

  3. Step 03

    Construction

    Execution on site under GLOBAL's QHSE management system.

    CompletedQ3 2024 – Q1 2025

  4. Step 04

    Commissioning

    Testing, handover and training for the client's operations team.

    CompletedQ2 2025

05 — Key figures

The project at a glance

Illustrative figures, to be confirmed by GCMS.

  • 100%

    Inspection and test plans closed out

    Quality target

  • 95%

    Local content in materials and labour

    Illustrative

  • 14mo

    Typical delivery programme

    Indicative

  • 0LTI

    Target lost-time injuries

    Our zero-harm goal

Start a project

When Quality Matters, We Deliver.

Talk to our Muscat team about engineering, building and operating your next power, water or solar asset.

Newsletter

Stay informed with GLOBAL

Project news, awards and insights from GCMS — straight to your inbox.