
Industrial Site Works — Phase 1
Duqm, Al Wusta
85 ha · Civil & site works

Access Road & Drainage Works in Sohar, delivered by one accountable GLOBAL team. 14 km · Civil.
Key facts
01 — Overview
Access Road & Drainage Works is part of GLOBAL's infrastructure & epc portfolio in the Sultanate of Oman. The work in Sohar is delivered with engineering, procurement, construction and handover managed by a single GLOBAL team.
Full project details, drawings and client references are available on request. Figures and dates shown here are illustrative placeholders pending confirmation by GCMS.
02 — Gallery

On site — Sohar




On site — Sohar



03 — Scope of work
Planning, execution and handover under one QHSE system.
01
Topographic survey, geotechnical review and construction-ready civil and structural design.
02
Aggregates, steel and equipment procured locally wherever possible and scheduled to the programme.
03
Earthworks, foundations, drainage and utilities built to inspection and test plans.
04
As-built records, quality close-out and a clean handover to the client's operations team.
04 — Project timeline
Indicative programme — dates to be confirmed.
Step 01
Contract awarded and mobilisation agreed for Access Road & Drainage Works.
CompletedQ1 2025
Step 02
Detailed design, method statements and long-lead procurement.
CompletedQ2 2025
Step 03
Execution on site under GLOBAL's QHSE management system.
CompletedQ3 2025 – Q1 2026
Step 04
Testing, handover and training for the client's operations team.
CompletedQ2 2026
05 — Key figures
Illustrative figures, to be confirmed by GCMS.
100%
Inspection and test plans closed out
Quality target
95%
Local content in materials and labour
Illustrative
14mo
Typical delivery programme
Indicative
0LTI
Target lost-time injuries
Our zero-harm goal
Start a project
Talk to our Muscat team about engineering, building and operating your next power, water or solar asset.
Newsletter
Project news, awards and insights from GCMS — straight to your inbox.